In short: under Section 3(2)(a) of the RERA Act, a project doesn't need registration if its land is 500 sq m or less or it has eight apartments or fewer, counting all phases. Authorities in different states disagree on whether one condition is enough or both are needed. A project that meets both (up to about 2.24 grounds and up to eight flats) is exempt under every reading. Without RERA, your protection comes from the approvals, title and agreement, so check those carefully.
Why some Chennai projects have no RERA number
Most apartment projects in Chennai carry a TNRERA number on every advert, and buyers are rightly told to look for it. But in the city's older neighbourhoods you'll also find boutique buildings of four to eight flats, often one per floor, built on one or two grounds. Many of these have no RERA number at all, and that isn't automatically a red flag.
The RERA Act deliberately leaves small projects out of compulsory registration. Knowing exactly where that line sits tells you whether a missing number is normal or a warning sign.
What Section 3(2)(a) says
Section 3(2)(a) of the Real Estate (Regulation and Development) Act, 2016 says no registration is required where the area of land proposed to be developed does not exceed 500 square metres, or the number of apartments proposed to be developed does not exceed eight, inclusive of all phases.
A proviso lets the state government lower these thresholds if it considers it necessary. We have not found any Tamil Nadu notification lowering them, but check with the developer or a lawyer for the latest position.
| Threshold | In sq m | In sq ft | In grounds (1 ground = 2,400 sq ft) |
|---|---|---|---|
| Land area limit | 500 | about 5,382 | about 2.24 |
| Apartment limit | 8 apartments, all phases together | — | — |
"Or" or "and"? Authorities don't agree
The word "or" in Section 3(2)(a) has been argued over across India:
- Either condition is enough. The Telangana real estate appellate tribunal held that a project is outside RERA if it meets either condition. Goa RERA's procedure says that land over 500 sq m with no more than eight apartments needs no registration. MahaRERA later clarified that either condition on its own exempts a project.
- Both conditions are needed. Rajasthan's RERA authority decided that a project is exempt only if the land is within 500 sq m and it has eight or fewer apartments. Law firm S.S. Rana takes the same view, and one member of a MahaRERA bench dissented on these lines.
For a buyer, the practical point is simple. A building of eight flats or fewer on land of 500 sq m or less is exempt whichever reading applies. If a project relies on only one of the two conditions, for example ten flats on a small plot, or six flats on a large one, ask the developer how they have concluded that registration isn't needed, and get legal advice.
Splitting land to stay under the limit doesn't work
In a 2022 case from Ayanavaram reported by DT Next, a promoter argued that his project didn't need registration because the land had been subdivided before building approval, with separate approvals for each part. The Tamil Nadu Real Estate Appellate Tribunal found the subdivision was done to avoid TNRERA registration, held that the number of survey numbers and subdivisions was immaterial, and dismissed the appeal.
So look at the whole development. If the developer is building adjoining blocks on neighbouring plots, count them together.
The other exemption: projects completed before RERA
Projects that obtained their completion certificate before RERA came into force (Tamil Nadu notified its rules on 22 June 2017) are also outside registration. This mostly matters for older resale flats, not new boutique projects.
What you give up without RERA registration
An unregistered project won't appear on the TNRERA portal, so you can't use it to check the declared completion date, the approved plans or the quarterly progress updates that registered projects file. Registered projects must also keep buyers' money in a separate project account. If the building is already complete, much of this matters less, because there's no construction risk left. If it's under construction, your agreement for sale has to do more of the work.
What to check on a project without a RERA number
- Count the units and measure the land on the approved plan. The CMDA or local-body planning permit shows the plot area and number of dwelling units. Check that both are within the limits, counting any later phase or adjoining block.
- Planning permit and building approval. Make sure the building matches the sanctioned plan, floor by floor.
- Completion certificate. For a ready flat, ask for the completion certificate. It's also what makes the sale free of GST. See under-construction vs ready-to-move flats.
- Title and encumbrance. Get the parent documents and a 30-year encumbrance certificate checked. See our guide to the encumbrance certificate.
- Undivided share (UDS). In a small building your UDS is a meaningful slice of prime land, so confirm it in the sale deed. See UDS explained.
- The agreement for sale. For an under-construction flat, insist on a written completion date, a penalty for delay, the payment schedule, specifications and car-park allotment.
- Bank approval. A home loan sanction from a major bank adds a second independent check on title and approvals.
For projects that do need registration, always confirm the number on the portal before paying anything. Here's how to check TNRERA registration.
Frequently asked questions
Sources
- Taxguru: RERA registration not required where area is under 500 sq m or flats are 8 or fewer — Quotes Section 3(2)(a)
- Mondaq / Argus Partners: RERA regime, the exemption conundrum — Proviso allowing lower thresholds; Goa RERA's reading
- Chambers / Argus Partners: RERA regime, the exemption conundrum (part 3) — Text of Section 3(2)(a); dissenting view that both conditions are needed
- Deccan Chronicle: Small apartments need not register with RERA, rules tribunal — Telangana appellate tribunal: either condition is enough
- Taxguru: Rajasthan RERA on Section 3(2)(a) — Exempt only if both conditions are satisfied
- S.S. Rana & Co.: RERA registration mandatory for areas more than 500 sq m — Argues both conditions must be met
- Mondaq: MahaRERA clarification on exemption from project registration — Land up to 500 sq m exempt irrespective of the number of units
- DT Next: Survey numbers, sub-divisions are immaterial for RERA exemption (28 Sep 2022) — TNREAT dismissed a promoter's appeal in an Ayanavaram project
- DT Next: RERA directs builders to state pre-2017 project approvals in ads (2018) — Projects with completion certificates before 22 June 2017 exempt
- Housing.com: Tamil Nadu RERA and how to check approval status — Rules approved 22 June 2017; registration thresholds